The present tender includes the implementation of static inspections for selected engineering structures (max. 93 objects) in the branch area of the infrastructure branch Zofingen (F3) of FEDRO. First and foremost, these checks are carried out for the assessment of navigability for special transports, as a by-product the degree of fulfillment for stresses from traffic loads from road traffic are also determined.
The review of the corresponding engineering structures is to be completed within three years (May 2023 – end of October 2025).
The services for the quality assurance of the static checks carried out are procured in a parallel advertised mandate (SoBe F3 Quality Assurance).
The present tender includes the implementation of static inspections for selected engineering structures (max. 93 objects) in the branch area of the infrastructure branch Zofingen (F3) of FEDRO. First and foremost, these checks are carried out for the assessment of navigability for special transports, as a by-product the degree of fulfillment for stresses from traffic loads from road traffic are also determined.
The review of the corresponding engineering structures is to be completed within three years (May 2023 – end of October 2025).
The services for the quality assurance of the static checks carried out are procured in a parallel advertised mandate (SoBe F3 Quality Assurance).