For the vocational school (RBBZ), a new two-field sports hall with an annex ("social wing") with various side rooms for equipment, technology, changing rooms and showers is planned. The sports hall must be adapted to the requirements of school sports and private sports clubs; it should continue to be divisible in three ways.
The sports hall including the extension ("social wing") is not built with a basement, but is built flat on striped and single foundations or floor slabs.
The two parts of the sports hall and annex are completely separated from each other by joints.
The bracing is therefore carried out separately for both parts of the building.
The sports hall is around 46 m long and 23 m wide and has an inner area of around 22 mx 45 m, which can be divided into 3 halls by partition curtains. The roof is designed as a pent roof with the high point on the southwest side. The building height varies between around 11 m on the southwest side and around 10 m on the northeast side. The supporting structure of the hall is made of steel framework frames.
Trapezoidal sheeting is used as the roof covering, which runs from the ridge (including the overhang) to the eaves and purlins. The purlins rest on the truss frame.
The extension of the sports hall "social wing" with the corresponding rooms adjoins the sports hall in the southwest and is about 50 m long and 15 or 16 m wide. The exact dimensions can be found in the plans. The solid ceiling of the one-story extension is supported on masonry walls with ring anchors. The entrance area is covered with a light steel structure.
For a sports hall (playing field 22 x 45 m), with 1 861 m
Are the following structural work to be carried out:
Construction site equipment: also for other trades involved in the construction such as the provision of sanitary containers, office containers, own construction site equipment
Earthworks: 340 m³ of earth excavation, drive off, deposit, deliver 1 275 m³ of earth material according to the building site report, install, compact, 2 500 m
Masonry: outer walls: 250 m
Masonry inner wall D 24cm KS L SFK12 RDK1.6 MGIIa, 370 m
Concrete and reinforced concrete work: 1 850 m
240 m³ in-situ concrete strip foundation reinforced concrete C25 / 30 XC2 B250 cm D 100 cm, with quiver, 40m³ in-situ concrete strip foundation reinforced concrete C25 / 30 XC2 W 100 cm D 100 cm, with recess, 1,880 m
Reinforced concrete C25 / 30 XC2 D 20 cm, 800 m
STEEL CONSTRUCTION: Steel support structure as a complete service consisting of 12 truss frames, which are clamped in quiver foundations, 10 attached gable supports the following main profiles: supports longitudinal axes: HEB 300 (24 pieces, approx. 260 running meters), supports gable axes: HEB 200 (10 pieces approx. 99 running meters) ,
Wall ledger: HEB 200 (2 pieces approx. 90 running meters), IPE 200 (2 pieces approx. 90 running meters), HEA 200 (1 piece approx. 45 running meters), swords T250 / 220/20/20 ... T440 / 220 / 20/20 (12 pieces approx. 33 running meters), Binder top flange: HEB 200 (12 pieces approx. 264 running meters),
Lower flange: HEB 160 (12 pieces approx. 264 running meters), stem: RO 100 x 100 x 4 (84 pieces approx. 160 running meters), diagonal: RO 100 x 100 x 4 (96 pieces approx. 336 running meters), purlins: HEB 140 (546 running meters) a total of approx. 110 t, 48 St insulated baskets for connecting a self-supporting cantilever to a steel support,
Sealing work: load case W1.1-E with 2 component, mineral, flexible sealing slurry, 348 m
Plastering work: Hall outside: 760 m
Ground pipes: 175 m KG pipe DN 100-150 including pipe trench
Lightning protection and earthing systems: Foundation earth electrode: 400 m earthing as foundation earth electrode DIN 18014, DIN EN 62561-2 (VDE 0185-561-2), line made of hot-dip galvanized steel, Fl 30, 16 connecting lugs, 650 m earthing, ring earth electrode, stainless steel Rd10, including connecting clamps.