The scope of work includes mechanical and manual snow clearing and combating the winter slippery surface of pavements, bicycle paths, separating islands and asylum for pedestrians along the entire width using roughing materials (sand), including sections that provide access to pedestrian crossings in:
a) Task no. 1 - City of Puławy and the town of Góra Puławska:
1) Sidewalks and bicycle paths - 26 426.00 m; 64 642.50 m
2) Separating islands and asylum for pedestrians - 2,212.00 m; 5 211.00 m
Total - 28,638.00 m; 69 853.50 m
b) Task no. 2 - City of Nałęczów:
1) Sidewalks - 11,140.00 m; 18 010.00 m
c) Task no. 3 - City of Dęblin:
1) Sidewalks and bicycle paths - 6,281.00 m; 14,717.00 m
d) Task No. 4 - road sections No. 824 and former DK 12:
2) Sidewalks and bicycle paths - 22,903.00 m; 40 518.70 m
The scope of work includes mechanical and manual snow clearing and combating the winter slippery surface of pavements, bicycle paths, separating islands and asylum for pedestrians along the entire width using roughing materials (sand), including sections constituting access points for pedestrian crossings in the city of Puławy and m. Puławska Mountain:
1) Sidewalks and bicycle paths - 26 426.00 m; 64 642.50 m
2) Separating islands and asylum for pedestrians - 2,212.00 m; 5 211.00 m
Total - 28,638.00 m; 69 853.50 m
The scope of work includes mechanical and manual snow removal and combating the slippery winter pavement surfaces along the entire width using roughing materials (sand), including sections constituting access points to pedestrian crossings in the city of Nałęczów: 11,140.00 m; 18 010.00 m
The scope of work includes mechanical and manual snow removal and combating the winter slippery surface of pavements and bicycle paths along the entire width using roughing materials (sand), including sections constituting access points to pedestrian crossings in the city of Dęblin: 6 281.00 m; 14,717.00 m
The scope of work includes intervention mechanical and manual clearing of snow and combating the slippery winter surfaces of pavements and bicycle paths along the entire width using roughing materials (sand), including the sections constituting the access points to pedestrian crossings in towns located along the road of the province. No. 824 and given DK12: 22,903.00 m; 40 518.70 m