Markt Gaimersheim is planning to renovate and expand the St. Rafael daycare center/kindergarten, Taubenring 15, 85080 Gaimersheim.
,
The aim of this tender is the gradual commissioning of a suitable engineering office with the service phases 1-9 of the service profile (service phase 4 only for plant group 1) of the service profile technical planning technical equipment in accordance with § 55 para. 1 HOAI in conjunction with Anl. 15 No. 15.1 in plant groups 1, 2, 3 and 8.
,
The assignment will be carried out in stages:
,
Stage 1: Work phases 1, 2 and 3 (work phase 4 only in plant group 1)
Stage 2: Work phases 5, 6 and 7
Stage 3: Work phases 8 and 9
in addition to the special services
,
As a special service, the monitoring of the rectification of defects within the framework of service phase 9 (as a lump sum) is to be commissioned.
,
For the interim solution of a container kindergarten, the services/partial services required and necessary for proper daycare center operation are commissioned. These services are to be offered as a lump sum.
Markt Gaimersheim is planning to renovate and expand the St. Rafael daycare center/kindergarten, Taubenring 15, 85080 Gaimersheim.
,
Currently, the kindergarten consists of 3 groups for a total of 75 children aged 2.5 years to school entry age. The building has a usable area of approx. 500 m². This existing kindergarten is now to be renovated and expanded to include a crèche group for 12 children with adjoining rooms as well as bedrooms, ancillary rooms and staff rooms for the existing kindergarten. Storage rooms are also needed.
,
The existing kindergarten is located on parcel 3245/82. The adjacent municipal undeveloped plot with the corridor no. 3245/81 can be taken into account for the planning. This results in a total land area of 4,000 m².
,
After the old kindergarten was built in 1983, the room concept no longer seems up-to-date for today's pedagogical requirements, so that even if the basic room layout can be retained, the current standard must be taken into account here by roofing and extensions. The building envelope, including the roof, is in need of renovation. The sanitary areas and floor coverings, doors, fire protection devices and building services would also have to be renovated. An exact cost volume has not yet been determined due to a lack of detailed renovation effort, but project costs (KG 200-700) of around EUR 7,000,000 are assumed. KG 400 is likely to account for around EUR 1,050,000 net. The ratio of renovation / expansion is estimated at 60/40.
,
There is to be an interim solution in the form of a container kindergarten, as renovation during ongoing operations is currently not being considered. In the immediate vicinity of the existing kindergarten there is an empty plot of land, which may be able to offer an interim location. It is important to upgrade the temporary container ( for the three kindergarten groups ) for temporary use to such an extent that an orderly day care center operation is guaranteed.
,
For the expansion and renovation of the kindergarten, the planning commission is scheduled for January 2024, the start of planning at the beginning of 2024 and the implementation of the measure is to begin/take place in 2024 and be completed by the beginning of 2026. Occupancy should be ready for occupancy by spring 2026.
,
The construction project is subsidized, so that appropriate experience with subsidies is expected and assumed.
,
The aim of this tender is the gradual commissioning of a suitable engineering office with the service phases 1-9 of the service profile (service phase 4 only for plant group 1) of the service profile technical planning technical equipment in accordance with § 55 para. 1 HOAI in conjunction with Anl. 15 No. 15.1 in plant groups 1, 2, 3 and 8.
,
The assignment will be carried out in stages:
,
Stage 1: Work phases 1, 2 and 3 (work phase 4 only in plant group 1)
Stage 2: Work phases 5, 6 and 7
Stage 3: Work phases 8 and 9
in addition to the special services
,
As a special service, the monitoring of the rectification of defects within the framework of service phase 9 (as a lump sum) is to be commissioned.
,
For the interim solution of a container kindergarten, the services/partial services required and necessary for proper daycare center operation are commissioned. These services are to be offered as a lump sum.