Construction work for houses

Contract Value:
EUR 10M - 10M
Notice Type:
Contract Notice
Published Date:
21 May 2021
Closing Date:
23 June 2021
Location(s):
IE IRELAND
Description:
50 Unit Housing Development at Rehin’s Fort, Ballina, Co. Mayo

Construction of a new social housing development at Rehin’s Fort located on a site to the rear of the existing ‘Rehin’s Fort’ housing estate, on the outskirts of the town of Ballina, Co. Mayo. The construction of 50 No dwellings comprising 2, 3 and 4 bedroomed semi-detached houses (including 1 No 4 bedroomed special needs dormer dwelling) along with services connections to existing public foul and storm sewer and utilities, all associated site development works, landscaping, including all ancillary site works; the provision of new street lighting and outlet ducts for future electric vehicle charging.

• 50 No new dwelling units, constructed as semi-detached blocks:

— 8 No semi detached 2 bed (4 person) single storey units;

— 22 No semi detached 2 bed (4 person) two storey units;

— 15 No semi detached 3 bed (6 person) two storey units;

— 4 No semi detached 4 bed (7 person) two storey units;

— 1 No semi detached 4 bed (7 person) special needs two storey dormer unit.

New social housing construction at Rehin’s Fort located on a site to the rear of the existing Rehin’s Fort housing estate on the outskirts of Ballina. The access from the main N26 Rd is through this existing estate. The site is adjacent to a green buffer zone along the Moy River and there is a tributary to the north and an existing factory (Hollister) to the south of the site. Development comprises the construction of 50 No dwellings and services connections to existing public foul, storm sewer and utilities, all associated site development, landscaping and ancillary works:

• provision of screen fencing to protect and enclose the site;

• 50 No new dwelling units, constructed as semi-detached blocks comprising:

— 8 No semi detached 2 bed (4 person) single storey units;

— 22 No semi detached 2 bed (4 person) 2 storey units;

— 15 No semi detached 3 bed (6 person) 2 storey units;

— 4 No semi detached 4 bed (7 person) 2 storey units;

— 1 No semi detached 4 bed (7 person) special needs 2 storey dormer unit.

• construction of temporary builder’s compound;

• maintain and protect existing access roadway through existing residential development throughout the works phase;

• construction of new access roadways;

• site clearance including removal of existing trees/shrubs;

• site clearance and bulk excavation to reduce site levels generally;

• removal of material excavated from site to a licenced landfill facility;

• redistribution of material excavated from site;

• re-grading of the site to suit final levels;

• construct a mixture of rendered block walls, timber palisade and chain link fences to site boundaries;

• construct stonework boundary walls to screen rear private gardens from public roadways/paths;

• construct timber palisade walls between gardens;

• site development and surfacing works i.e. roads/paths/paving’s to tie into and continue on existing public roads and path;

• new connections to public utilities for all units and new street lighting and outlet ducts for future Electric vehicle charging.

Download full details as .pdf
The Buyer:
Mayo County Council
CPV Code(s):
45210000 - Building construction work
45211100 - Construction work for houses