Tiling work | Tenderlake

Tiling work

Contract Value:
EUR 122K - 122K
Notice Type:
Contract Notice
Published Date:
07 August 2023
Closing Date:
11 September 2023
Location(s):
DEF09 Pinneberg (DE Germany/DEUTSCHLAND)
Description:
Caspar Voght School; Tile, slab and cast stone work

The construction project "Extension of the Caspar-Voght-Schule Rellingen (CVE)" is the construction of another school building to the existing buildings of the primary and community school Rellingen. The school's property is located at Schulweg 2 in 25462 Rellingen in the state of Schleswig-Holstein. The planned school building is to be erected with a floor area of approx. 756 m2. It consists of three floors (ground floor, 1st and 2nd floor) and has no basement. The maximum building dimensions of the rectangular structure are approx. 42 x 18 x 12 m in length x width x height.

approx. 125 m2 of dry-pressed tile flooring,

approx. 200 m skirting boards made of dry-pressed tiles,

approx. 400 m2 of wall cladding made of dry-pressed tiles,

approx. 90 m2 flooring made of cast stone slabs in stairwells,

approx. 90 steps and risers made of cast stone slabs, including 4 intermediate platforms

Download full details as .pdf
The Buyer:
Gemeinde Rellingen
CPV Code(s):
45214000 - Construction work for buildings relating to education and research
45431000 - Tiling work