Scope:
Lot 1 Civil engineering and track works
Lot 2 Supply of track materials
The 3 Fahrleitungsbau
Civil engineering and track construction workScope:
Track construction:
Gleisrückbau 3.200 m
Grooved track in the Dresden superstructure 3,200 m
Rail joint welds 118 pieces
Switch installation (temporary construction) 1 piece
Haltestellenumbau:
Barrier-free expansion stops 4 pieces
road construction:
Asphalt work 16.400,00m²
GleisbaumaterialRillenschiene Profile 59R2 R200 6.400,00 m
Elastic bearing 59R2
Prestressed concrete sleepers incl. fastening 4,270.00 pieces
Track drainage boxes 76 pieces
Cuffs for on-site weld joints 430,00 Stück
FahrleitungsbauScope:
Oberleitungsarbeiten:
Dismantling masts 69 pieces
Dismantling of contact wire 3,700 m
New masts 69 pieces
Contact wire 3,700 m
Track separator 6 pieces