The project management mission will include a core mission: ESQ-APS-APD-PRO-ACT-VISA-DET-AOR.
Programme: construction of approximately 43 collective dwellings.
Estimated cost of the works: 4 545 345.00 EUR excl. VAT (based on 1 800,00 EUR excl. VAT /m
Duration of the contract (studies-works): 54 months as from the notification of the contract (period of GPA included).
Start of the project management mission: September 2021.
Form of market: ordinary. Award of a single market.
The group will consist of the following competences: architecture (architects or architectural firm — DPLG, DESA, DEA + HMONP or equivalent listed in the order table), VRD (hydraulic calculation) structure, thermal-fluids, construction economics, acoustics and landscape.
The representative of the grouping (of your choice) must belong exclusively to one team. The other economic operators may appear in several teams.
The project management mission will include a core mission: ESQ-APS-APD-PRO-ACT-VISA-DET-AOR.
Programme: construction of approximately 43 collective dwellings.
Estimated cost of the works: 4 545 345.00 EUR excl. VAT (based on 1 800,00 EUR excl. VAT /m
Duration of the contract (studies-works): 54 months as from the notification of the contract (period of GPA included).
Start of the project management mission: September 2021.
Form of market: ordinary. Award of a single market.
The group will consist of the following competences: architecture (architects or architectural firm — DPLG, DESA, DEA + HMONP or equivalent listed in the order table), VRD (hydraulic calculation) structure, thermal-fluids, construction economics, acoustics and landscape.
The representative of the grouping (of your choice) must belong exclusively to one team. The other economic operators may appear in several teams.