2020set070bis — RD 613 — Bellengreville and Vimont deviation — environmental coordination — recovery.
The purpose of the consultation is: environmental coordination mission, assistance in the implementation of ERC measures defined by the impact assessment, the DUP and the single environmental authorisation including the design and implementation phases as part of the work of the deviation of the RD 613 in the municipalities of Bellengreville and Vimont. The overall layout includes the realization of:
— a roundabout on the current RD 613 to which the Bar of DR 40, access to the Moult AZ, the current RD 613, the road restoration of DR 41 and the future RD 613 will be connected, (not included in mission, work completed between February and June 2021);
— recovery pathways for DR 41 in Vimont (not included in mission, work completed between February and June 2021) and VC 3 in Bellengreville;
— five works of art for the freshway recovery of DR 41 (not included in mission — bridge completion and freshtrack recovery of DR 41 planned between February and July 2022), highway recovery of BC 201, DR 227 and VC 3, and the waterway recovery and large wildlife passage of the Sémillon River;
— approximately 4 km of road in 2 × 2 lanes between the future roundabout located in Vimont on RD 613 and the existing roundabout RD 613 — A 813 located in Frénouville;
- all the sanitation work required for these developments;
- works related to land development;
- landscaping;
- signage.