The subject of the contract is the implementation of the task entitled Comprehensive maintenance of riverbeds and water facilities in the area of Water Supervision in Kazimierza Wielka. The order has been divided into 3 lots, each of which includes separate tasks. Work on all parts of the contract must be carried out under the control of environmental supervision. Detailed rules for exercising supervision are specified in the Description of the subject of the contract and the draft contract. The cost of providing environmental supervision shall be borne by the Contractor. The detailed scope and order is specified in the description of the subject of the contract (Annex No. 2 to the SWZ) and the draft contract (Annexes No. 1 to the SWZ). Note: an integral part of the description of the subject of the contract are templates of offer calculations (Annex 4 to the SWZ), which in terms of item description and measurement determine the subject of the contract and thus act as bills of quantities.
Comprehensive maintenance of watercourses and water facilities in the area of NW Kazimierza Wielka – I1. Comprehensive maintenance of the government Jakubówka at km 0+440-1+900 in the town of Działoszyce, Jakubowice and at km 6+900-7+800 in the town of Jakubowice. Kujawki
The scope of works to be performed includes m.in .:
at km 0+000 – 0+150:
I. cutting trees with a power saw with a diameter of 10-15 cm – 2 pcs.;
II. cutting trees with a power saw with a diameter of 16-25 cm – 2 pcs.;
III. cutting trees with a power saw with a diameter of 26-35 cm – 3 pcs.;
IV. cutting trees with a power saw with a diameter of 36-45 cm – 4 pcs.;
V. cutting trees with a power saw with a diameter of 46-55 cm – 4 pcs.;
VI. cutting trees with a chainsaw with a diameter of 56-65 cm – 1 pc.;
VII. use of a basket lift in felling trees - 15 pcs.;
VIII. removal of logging residues with transport to the place of chipping – 11.00 mp;
at km 0+720 – 0+780:
I. desilting of the trough (manual or mechanical depending on the terrain conditions and equipment capabilities) at km 0+720 – 0+780 – 60 m3;
II. land transport – 60 m3.
at km 0+270:
I. desilting of the trough (manual or mechanical depending on the terrain conditions and equipment capabilities) – 15 m3;
II. land transport – 15 m3.
at km 1+080 – 1+600:
I. cutting bushes of medium density (with grubbing in places where carps form narrowing of the trough – 0.2 ha;
II. cutting trees with a power saw with a diameter of 36-45 cm – 1 pc.;
III. cutting trees with a chainsaw with a diameter of 66-75 cm – 2 pcs.;
IV. use of a basket lift when felling trees - 3 pcs.;
V. removal with transport to the place of chipping of felling residues – 63.2 mp;
at km 1+600 – 1+700:
I. manual backfilling of beaver burrows by compacting embankments with layers of 20 cm from category III soil deposited – 4 m3;
II. repair of slopes and banks by sowing – 90 m2;
at km 6+900 – 7+800:
I. cutting of bushes of medium density (with grubbing in places where carps form narrowing of the trough – 0.05 ha
II. cutting trees with a power saw with a diameter of 10-15 cm – 2 pcs.;
III. cutting trees with a power saw with a diameter of 16-25 cm – 5 pcs.;
IV. cutting trees with a chainsaw with a diameter of 26-35 cm – 4 pcs.;
V. cutting trees with a power saw with a diameter of 36-45 cm – 3 pcs.;
VI. removal of felling residues with transport to the place of chipping – 18.86 mp;
VII. manual mowing of dense hard lichens from slopes of ditches, crowns and slopes of embankments – 7 200 m2;
VIII. execution and maintenance of wooden mattresses for front excavators with a bucket capacity of 1.2m3 at km 7+100-7+400 – 700 m3;
IX. desilting of the trough (manual or mechanical depending on the terrain conditions and equipment capabilities) at km 6+900 – 7+800 – 1750 m3;
X. cleaning pipe culverts with a diameter of 0.80 m from silt with a depth of silting of the cable up to 1/3 of the height of the diameter - 13.5 m;
XI. cleaning of frame culverts 2.0x2.0 m from silt with a depth of silting of the cable up to 1/3 of the height (bridge "Kujawki" clearance 2.30 m and length 4.50 m) – 4.5 m;
XII. making single and double bands from fascine sausage with a diameter of 15 cm with land transport – 250 m;
XIII. obsiewie skarp – 4 500 m2;
XIV. underseeding in turf areas in 1-stage track-wheeled technology in difficult and normal conditions with a rotary tiller as a leading machine on light, medium and peat soils – 0.9 ha.
2. Comprehensive maintenance of the government Wiekanocna at km 1+000-2+800 in m. Dzierążnia
The scope of works to be performed includes m.in .:
at km 1+250-1+988:
I. manual or mechanical (depending on the terrain) mowing of dense hard lichens from slopes - with transport outside the work area and disposal - 3 690 m2;
II. manual cutting and grubbing of bushes of medium density - shrubs whose age does not exceed 10 years with grubbing of trunks (approx. 20%), which grow in the bottom or on slopes, where carps form narrowing of the trough - 0.23 ha;
III. cutting trees with a power saw (diameter 16-25 cm) – 10 pcs.;
(...)
Detailed OPZ attached to the SWZ
Comprehensive maintenance of watercourses and water facilities in the NW Kazimierza Wielka – II1. Comprehensive maintenance of the government Tributary from Poplar at km 0+850 -1+900 in m. Poplar
The scope of works to be performed includes m.in .:
at km 0+850 -1+365:
I. manual or mechanical (depending on the terrain capabilities) mowing of dense hard lichens from slopes - with transport outside the work area and disposal - 2 575 m2;
II. land preparation - mowing old vegetation (for planting) – 0.515 ha;
III. manual shearing and grubbing of medium density coppice - without grubbing - 0.01 ha;
IV. removal with transport to the place of chipping of the remains of felling – 2.86 mp;
V. removal of local dams - clearing the trough and clearing and managing the material from demolition on their own - beaver dams on the basis of dec. RDOŚ sign: WPN-II.6401.58.2021.PK of 16.08.2021 - 15 mp;
VI. excavation of riverbeds, canals and ditches carried out by excavators with spreading of excavated material with dozers; Obj. excavation up to 5.0 m3/m of watercourse, soil category IV excavator 0.25 m3 (desilting of the watercourse) – 1 680 m3;
VII. repair of slopes by sowing – 2 575 m2;
VIII. development of the plantation with sowing with a grass mixture – 0.62 ha.
2. Comprehensive maintenance of the government Jawornik at km 9+600-11+200 in the town of Jaworník Donatkowice and 13+800-14+000 in m. Krzyszkowice
The scope of works to be performed includes m.in .:
at km 10+125 - 10+260:
I. manual or mechanical (depending on the terrain capabilities) mowing of dense hard lichens from slopes - with transport outside the work area and disposal - 1 210 m2;
II. cutting trees with a power saw (diameter 10-15 cm) – 6 pcs.;
III. cutting trees with a power saw (diameter 16-25 cm) – 2 pcs.;
IV. cutting trees with a power saw (diameter 26-35 cm) – 1 pc.;
V. manual felling and grubbing-up of medium density coppice (without grubbing-up) —
0.021 ha;
VI. removal with transport to the place of chipping of felling residues – 7.126 mp;
VII. mechanical grubbing of trunks (diameter 26-35 cm) – 2 pcs.;
VIII. excavations of riverbeds, canals and ditches carried out by excavators with transport of spoil to the section. up to 1.0 km; Obj. excavation up to 5.0 m3/m of watercourse, soil category III excavator 0.25 m3 - mechanical removal of landslides within the culvert along the district road No. 0531T with partial incorporation into the cavities in the slopes, at km 10+190-10+260 – 190 m3;
IX. supplementary expenditures to tables 2301,2308-2310 and 2313 for each commenced 0.5 km distance of road transport over 1.0 km, category IV-V roads; total transport distance 2.0 km - development of excavated material on its own - 180 m3;
X. making single bands from fascine sausage with diameter. 15 cm, at km 10+190-10+260 –
112 m;
XI. paving of slopes, ditches and embankments on ballast of sand or co. with flooding of cracks with cement mortar - strengthening the slope with a stone armour with pouring cracks with cement mortar above the culvert, at km 10+190-10+260 – 55 m2;
XII. repair of slopes by sowing, at km 10+190-10+260 – 195 m2;
at km 10+700 - 11+200:
I. manual or mechanical (depending on the field capabilities) mowing of dense hard lichens from slopes together with transport outside the work area and utilization, at km 10+700-11+200 – 4,000 m2;
II. manual felling and grubbing of medium-density coppice (without grubbing), at km 10+700-11+200 – 0.15 ha;
III. mechanical grubbing of trunks (diameter 46-55 cm) – 1 pc.;
IV. mechanical grubbing of trunks (diameter 56-65 cm) – 1 pc.;
V. mechanical grubbing of trunks (diameter 66-75 cm) – 1 pc.;
VI. cutting trees with a power saw (diameter 10-15 cm) – 46 pcs.;
VII. cutting trees with a power saw (diameter 16-25 cm) – 15 pcs.;
VIII. cutting trees with a chainsaw (diameter 26-35 cm) – 4 pcs.;
IX. cutting trees with a chainsaw (diameter 36-45 cm) – 3 pcs.;
X. cutting trees with a power saw (diameter 46-55 cm) – 1 pc.;
XI. cutting trees with a power saw (diameter 56-65 cm) – 1 pc.;
XII. cutting trees with a power saw (diameter 66-75 cm) – 2 pcs.;
XIII. removal of felling residues with transport to the place of chipping – 60.74 mp;
(...)
Detailed OPZ attached to the SWZ
Comprehensive maintenance of watercourses and water facilities in the area of NW Kazimierza Wielka – III1. Comprehensive maintenance of the government Kalinka at km 0+000-3+000 in m. Janowice, Śladów and
at km 6+800 in Kalina Wielka and 7+200 km in Kalina Mała
The scope of works to be performed includes m.in .:
at km 0+860 - 1+190:
I. manual or mechanical (depending on the terrain) mowing of dense hard lichens from slopes - with transport outside the work area and disposal - 2 310 m2;
II. manual felling and grubbing of dense bushes and undergrowth - (without grubbing) - removal of bushes - 0.15 ha;
III. removal with transport to the place of chipping of the remains of felling – 64.35 mp;
IV. excavations of riverbeds, canals and ditches carried out by excavators with transport of spoil to the section. up to 1.0 km; Obj. excavation up to 1.5 m3/m of watercourse, soil category III excavator 0.25 m3 - mechanical removal of landslides – 560 m3;
V. supplementary expenditures to tables 2301,2308-2310 and 2313 for each commenced 0.5 km distance of road transport over 1,0 km, category IV-V roads; total transport distance 3.5 km, possibility of transporting land to fill in bank gaps in m. Giebułtów – 560 m3;
VI. Cleaning of frame culverts 2.0x2.0 m from silt at a depth ratio. silting up to 1/3 diameter - NOTE: horizontal light of the bridge 4.5 m – 8 m;
VII. repair of slopes by sowing – 1 650 m2;
at km 1+190-1+450:
I. manual or mechanical (depending on the terrain) mowing of dense hard lichens from slopes along with transport outside the work area and disposal – 1560 m2;
II. manual felling and grubbing of dense bushes and undergrowth - (without grubbing) - removal of suckers from wicker sausage and bushes - 0.104 ha;
III. removal of logging residues with transport to the place of chipping – 42.90 mp;
IV. removal of local dams - clearing of the riverbed and clearing and managing the material from the demolition on their own - demolition of the beaver dam at km 1+195
(based on the decision of the RDOŚ mark: OP.6401.53.2023.GZ of 08.02.2023) - 5 MP
V. excavation of riverbeds, canals and ditches carried out by excavators with transport of excavated material to the section. up to 1.0 km; Obj. excavation up to 1.5 m3/m of watercourse, soil category III excavator 0.25 m3 - mechanical removal of landslides – 168 m3;
VI. supplementary expenditures to tables 2301,2308-2310 and 2313 for each commenced 0.5 km of road transport distance over 1.0 km, category IV-V roads; total transport distance 2,0 km – 168 m3;
VII. repair of bands made of fascine sausage with avg. 20 cm. Cat. soil III - removal of the wicker sausage band and in its place laying the forest sausage band (right and left bank) NOTE: purchase forest fascine – 240 m;
VIII. repair of slopes by sowing – 600 m2;
2. Comprehensive rz. Nidzica buildings of rifts at km 10+205-10+237 in the town of Nidzica. Stain,
at km 25+630-25+650 in m. Poplar, at km 50+875-51+075 in the town of Poplar. Giebułtów m and felling trees at km 7+930-8+120 in m. Moravians, at km 60+200-60+700
in m. Rzędowice
The scope of works to be performed includes m.in .:
at km 7+930 – 8+120:
I. cutting trees with a power saw with a diameter of 16-25 cm – 1 pc.;
II. cutting trees with a power saw with a diameter of 26-35 cm – 9 pcs.;
III. cutting trees with a power saw with a diameter of 46-55 cm – 3 pcs.;
IV. cutting trees with a power saw with a diameter of 56-65 cm - 5 pcs.;
V. removal of trees with a basket lift – 4 pcs.;
VI. removal of logging residues with transport to the place of chipping – 15 mp.
at km 60+200 – 60+700:
I. felling trees with a chainsaw with a diameter diameter. 26-35 cm – 3 pcs.;
II. felling trees with a chainsaw with a diameter diameter 36-45 cm – 2 pcs. ;
III. felling trees with a chainsaw with a diameter diameter. 46-55 cm – 2 pcs.;
IV. cutting trees with a chainsaw with a diameter diameter 66-75 cm – 1 pc.;
V. removal of trees with a basket lift – 2 pcs.;
VI. removal with transport to the place of chipping of felling residues – 9.42 mp.
at km 10+205-10+237:
I. cutting of bushes – 0.002 ha;
II. cutting trees with a diameter of 10-15 cm with a power saw – 5 pcs.;
III. cutting trees with a diameter of 16-25 cm with a power saw – 2 pcs.;
(...)
Detailed OPZ attached to the SWZ