Profiling & construction of a landfill surface seal and basic seal DA 5c as well as infrastructural facilities

Profiling of the landfill body and construction of a surface sealing system on the western embankment, the southern embankment and the hilltop area as well as the associated infrastructural facilities.

Production in accordance with the specifications of the DepV, BQS and BAM approvals in the latest versions. Dismantling of an existing digestion basin and expansion of a further landfill section DA 5c.

Manufactured in accordance with the specifications of the DepV, BQS and BAM approvals in the latest versions.

Creation of an asphalt construction site with infrastructural facilities and edging with gabions and reinforced earth.

Profiling of the landfill body and construction of a surface sealing system on the western and southern embankments and the associated infrastructural facilities.Manufacture in accordance with the specifications of the DepV, BQS and BAM approvals in the latest versions

- approx. 15,000 m 3 Removal of soil, intermediate storage and reinstallation as recultivation soil,

- approx. 100,000 m 3 Relocate and install material / landfill replacement building materials,

- approx. 50,000 m 3 Removal and installation of landfill,

- approx. 83,000 m 3 Redensification of the landfill surface and fine subgrade,

- approx. 10,000 m 3 Pipe trenches and excavation,

- approx. 550 m exposure of connection areas of the existing base seals and establishment of the connection,

- approx. 1 pc test field,

- approx. 25,000 m 3 Supply and install material for gas-permeable base and leveling layers,

- approx. 83,000 m 2 create a protective mineral layer,

- approx. 4,000 m 3 supply and install mineral sealing material,

- approx. 83,000 m 2 deliver and install geosynthetic clay liner,

- approx. 83,000 m 2 Delivery and installation of PEHD plastic geomembrane,

- approx. 6,000 m 2 Geotextile at least 400 g / m 2 deliver and lay,

- approx. 83,000 m 2 Deliver and install drainage mat,

- deliver and install approx. 5,000 t of gravel and crushed stone of various grain sizes,

- deliver and install approx. 480 pieces of gabions with substructure,

- approx. 1,500 m 2 Service roads made of gravel with a frost protection layer and base layer,

- approx. 100,000 m 3 Pick up the recultivation layer from the interim storage facility, transport and install as a recultivation layer,

- approx. 81 400 m 2 Injection greening,

- approx. 880 m 2 Delivery of hydraulic engineering pavement for trench lining and laying in concrete,

- approx. 3,000 m PEHD pipelines from 90 to 160,

- approx. 15 St. seal penetrations on gas wells,

- Occupational health and safety,

- traffic safety measures,

- surveying work.,

Dismantling of an existing digestion basin and expansion of a further landfill section DA 5c Production in accordance with the specifications of the DepV, BQS and BAM approvals in the latest versions

- approx. 1 h dismantling of the existing digestion basin,

- approx. 800 m 3 Excavation of pipe trenches and construction pits,

- approx. 3 500 m 3 Soil removal, transport and interim storage,

- approx. 20 m 3 Removal of deposit and reinstallation,

- Approx. 125 m exposure of connection areas of the existing base seals and establishment of the connection,

- approx. 800 m 3 deliver mineral sealing material and install it as a technical barrier,

- approx. 800 m 3 deliver mineral sealing material and install it as a mineral seal,

- approx. 1,600 m 2 Delivery and installation of PEHD plastic geomembrane,

- approx. 1,600 m 2 deliver and install geotextile protective layer,

- approx. 1,600 m 2 Deliver material 0/8 mm as crushed grain or equivalent and install it as a mineral protective layer,

- approx. 1,600 m 2 Deliver 16/32 mm material as crushed grain or equivalent and install it as a mineral drainage layer,

- approx. 800 m 3 Delivery and installation of DK II material as a frost protection layer,

- approx. 400 m 2 Road construction with substructure and hydraulically bound ceiling,

- Occupational health and safety,

- traffic safety measures,

- surveying work.

Creation of an operating area with infrastructural facilities

- approx. 1 900 m 2 Road construction with frost protection layer, base course, asphalt base course, binder course, asphalt concrete, semi-rigid surface,

- approx. 800 m 2 Gabion wall up to 4 m high,

- approx. 3,000 m 2 reinforced earth,

- drainage facilities,

- infrastructural facilities.

Download full details as .pdf
The Buyer:
Zweckverband A.R.T.
CPV Code(s):
45000000 - Construction work
45200000 - Works for complete or part construction and civil engineering work
45222110 - Waste disposal site construction work