In the southern Oberwiesenfeld construction area, an ensemble of buildings consisting of 4 houses, each with 5 to 8 floors and an underground car park, is being built in 2 construction phases.
Approx. 600 subsidized apartments are planned, plus 3 kindergartens and office space for the stadium construction.
The planning area remains largely car-free above ground. The shape and inner structure of the southern building form a protection against the heavily used Schwere-Reiter-Straße.
The 1st phase includes approx. 300 apartments, 2 daycare centers and office space for the stadium construction.
- 4 lifts 10 stops load capacity 1 000 kg,
- 6 lifts 9 stops load capacity 1 000 kg,
- 2 lifts 8 stops load capacity 1 000 kg,
- 1 pc.lift 7 stops load capacity 1 000 kg,
- 1 pc.lift 3 stops load capacity 1 150 kg,
- 1 pc elevator 2 stops load capacity 800 kg,
- 1 pc elevator 2 stops load capacity 680 kg,
- 3 pieces of ENEV-compliant elevator shaft ventilation system.