Heating, ventilation, sanitary and electrical installations
Heating, ventilation and sanitary installations- 2 air handling units (10.500 & 7500 m³/h) - 1.100 m² ventilation ducts, 470 ml spiral ducts, 85 fire dampers - 1.300 ml of steel heating pipes - 26 radiators - 18 toilets and 17 washbasins - 550 ml of stainless steel sanitary pipes - Set of regulation equipment, electrical panels, wiring Start of works: 21/08/2023 Duration of work: 250 working days Minimum conditions of participation: 3 similar references Turnover: 1.7 million €/year Number of persons: min. 20
Electrical installation- temporary installation site 63 A - class III surge protection installation - photovoltaic system 75 kWp - 3 distribution boards 63A - 700 m cable trays - 200 switches and sockets - 200 lights (indoor – outdoor - rescue) - 100 fire detections - 2 smoke extraction - computer network, rack for 325 connections, 6 km Cat7 cabling - classroom equipment, 8 whiteboards, projector, photocopier Start of work: 21/08/2023 Duration of works: 250 working days Minimum conditions of participation: 3 similar references Turnover: 1.3 million €/year Number of persons: min. 15