General renovation of Werkrealschule with canteen extension
scaffolding workscaffolding work
approx. 550m² façade scaffolding incl. net
Metal construction and locksmith workMetal construction and locksmith work
3 pcs 2-leaf RS doors
3 pcs steel railing E0-E2
Plastering and stucco work, ETICSPlastering and stucco work, ETICS
various plaster additions after installation work
approx. 250m² renovation ETICS
Painting and painting workPainting and painting work
approx. 1200m² painting ceiling GK-perforated
approx. 2200m² painting walls incl. fiberglass wallpaper
approx. 2600m² revision paint walls
Flooring workFlooring work
approx. 1200m² lino flooring including grouting and initial cleaning
Carpentry - interior doorsCarpentry - interior doors
approx. 28 pcs Interior doors with wooden door leaf / steel frame
approx. 2 fire doors with wooden door leaf / steel frame
elevator systemelevator system
1-person elevator over 3 floors
demolition workdemolition work
approx. 1200m² demolition flooring
approx. 1000m² demolition GK ceilings
structural workstructural work
Construction of elevator shaft E0-E2
Creation of floor slab for canteen extension (approx. 50m²)
Opening and closing of StB and MW openings
DachabdichtungsarbeitenDachabdichtungsarbeiten
approx. 100m² waterproofing roof area
approx. 50m² waterproofing floor slab
Fall protection for 100m² roof area
Carpentry and woodworkCarpentry and woodwork
Timber frame construction incl. roof for extension canteen incl. façade cladding
Disassembly and reassembly of existing façade cladding
SanitarySanitary
approx. 58 running metres of dirty water and rainwater pipes
approx. 125 linear metres of drinking water pipes with thermal insulation
27 pcs sanitary fittings
15 pcs mounting elements for pre-walls
1 pcs decentralised wall ventilation units 60m³/h
approx. 40 m dismantling sewage pipes
approx. 56 running metres Dismantling sanitary pipes
17 pcs Dismantling sanitary facilities
Heating / VentilationHeating / Ventilation
approx. 345 running metres of heating pipelines with thermal insulation
30 pcs radiators
3 pcs heat meter
approx. 260 m dismantling pipelines
30 pcs dismantling radiators
Electrical workElectrical work
Cables and wires: approx. 22km
Luminaires: approx. 250 pcs
Distribution and meter places: approx. 25 pcs
Data connections: approx. 250 pcs
TrockenbauarbeitenTrockenbauarbeiten
ca. 1100m² GK-Abhangdecken
approx. 25m² Leichtbauwände