Motorway construction works | Tenderlake

Motorway construction works

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
21 December 2020
Closing Date:
02 February 2021
Location(s):
DE249 Hof, Landkreis (DE Germany/DEUTSCHLAND)
Description:
Traffic safety for conservation measure D252RL

The maintenance measure D252RL extends in the Hermsdorf - Hof section in the Free State of Bavaria from south of the Berg / Bad Steben junction (NK 5636008) to the Bavarian Vogtland motorway triangle (NK 5636021) between operating km 251.300 and operating km 256.420 in both directions.

In addition to the renewal of the pavement (replacement of the surface and binder course, base course as required), the repair of engineering structures, the renewal of vehicle restraint systems, the repair of drainage pipes and the production of stable gravel banks.

D252R:

- 5 700 m 0 + 4s traffic safety for workplaces of longer duration assemble and dismantle, hold, maintain and operate with T1 / W3 protective wall,

- Provide, maintain and operate 75 d 0 + 4s traffic safety,

- Set up and dismantle, maintain, maintain and operate 90 pieces of traffic safety for jobs of shorter duration

- Set up, maintain, maintain and operate 400 m H1 / W4 protective equipment,

- Set up, maintain, maintain and operate 5 400 m T3 / W2 protective device,

- 16,500 m temporary longitudinal marking type II made of KSP and foil, width 0.15 and 0.30 m

- 1 psch traffic safety for workplaces of longer duration Closure of connection point set up and dismantle, hold, maintain and operate,

- 225 inspection trips.

D252L:

- 5 600 m 4s + 0 traffic safety for long-term workplaces, erecting and dismantling, holding, maintaining and operating with T1 / W3 protective wall,

- Provide, maintain and operate 84 d 4s + 0 traffic safety,

- Set up, maintain, maintain and operate 900 m H1 / W4 protective equipment,

- Set up, maintain, maintain and operate 5 400 m T3 / W2 protective device,

- 15 200 m temporary longitudinal marking type II made of foil, width 0.15 and 0.30 m,

- 1 psch traffic safety for workplaces of longer duration Closure of connection point set up and dismantle, hold, maintain and operate,

- 252 inspection trips.

Generally:

- 159 d Setting up and dismantling, maintaining, maintaining and operating the mobile traffic jam warning system.

- 10 St. Various traffic safety devices for workplaces of shorter duration (preliminary phase, post phase, bridge construction, subordinate road network) set up and dismantle, maintain, maintain and operate, sometimes with traffic lights.

Download full details as .pdf
The Buyer:
Autobahndirektion Nordbayern
CPV Code(s):
45233110 - Motorway construction works
45233130 - Construction work for highways
45316213 - Installation of traffic guidance equipment