Electrical wiring and fitting work | Tenderlake

Electrical wiring and fitting work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
20 March 2020
Closing Date:
22 April 2020
Location(s):
DE273 Kempten (Allgäu), Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
FOS-BOS_Electrotechnical system BA 1B

- 1 pc main building distributor;

- 3 floor distributors;

- 7 media columns including installation distributor;

- 3 pc network cabinets;

- 6 pcs. Group battery system with approx. 280 lights;

- 1 pc electro-acoustic system (ELA) with approx. 90 loudspeakers;

- 3 pc power supplies with router for KNX;

- 6 KNX / Dali gateway;

- 1 pc visualization;

- 1 pc door station with color camera;

- 1 RWA control center;

- approx. 70 m underfloor duct with installation boxes including equipment;

- approx. 33,000 m cables including MSR cabling;

- approx. 18,000 m of low-voltage lines including MSR cabling;

- approx. 1,000 m fiber optic cable;

- approx. 330 interior lights, controllable via KNX or Dali.

In the existing building, a new main distributor is installed on the ground floor, from here the sub-distributors, which are located on the respective floors, are supplied. A media column with sub-distributor is installed in each classroom. In meeting rooms and marketplaces, installation takes place in floor boxes, otherwise usually in the suspended ceiling. The lighting control is largely dependent on daylight and via presence detectors. The service-independent structured data cabling ends centrally in a computer room and is networked with the new building. Building automation is implemented via KNX. The safety lighting with a nominal operating time of 3 hours is designed as a group battery system. The ELA system is located in the new building and is only used for announcements and as a gong for the hour change.

- 1 pc main building distributor;

- 3 floor distributors;

- 7 media columns including installation distributor;

- 3 pc network cabinets;

- 6 pcs. Group battery system with approx. 280 lights;

- 1 pc electro-acoustic system (ELA) with approx. 90 loudspeakers;

- 3 pc power supplies with router for KNX;

- 6 KNX / Dali gateway;

- 1 pc visualization;

- 1 pc door station with color camera;

- 1 RWA control center;

- approx. 70 m underfloor duct with installation boxes including equipment;

- approx. 33,000 m cables including MSR cabling;

- approx. 18,000 m of low-voltage lines including MSR cabling;

- approx. 1,000 m fiber optic cable;

- approx. 330 interior lights, controllable via KNX or Dali.

Download full details as .pdf
The Buyer:
ZV Berufliches Schulzentrum
CPV Code(s):
45311000 - Electrical wiring and fitting work
45311200 - Electrical fitting work
45314000 - Installation of telecommunications equipment
45314200 - Installation of telephone lines
45314310 - Installation of cable laying
45314320 - Installation of computer cabling
45316000 - Installation work of illumination and signalling systems
45316100 - Installation of outdoor illumination equipment