Integrated contract for the assignment of the executive design and construction works of the new four-seater detachable chairlift "Polla – Lago Scaffaiolo" to replace the four-seater fixed-grip chairlift "Direttissima" and the "Cupolino" ski lift in the Municipality of Lizzano in Belvedere (BO)
The new cableway, to replace a chairlift and a ski lift, consists of a valley station, an intermediate station on the uphill branch only and a mountain station with a total length of the route (horizontal length between the station entrances) of 977.20 m, an average gradient of 30.21% and 15 line supports; The maximum expected hourly capacity is 1800 p/h with a total of 52 open four-seater vehicles (i.e. without fairing).
The planned works do not include the construction of new ski slopes or downhill slopes.
As a result of the construction of the new lift, a four-seater chairlift and a high-rope ski lift were decommissioned; From a functional and transport point of view, it is an intervention to replace existing systems.
The works envisaged in the project essentially consist of the dismantling of the existing chairlift and ski lift station lines and structures and the construction of the cableway infrastructure of the new facility, followed by the related mechanical assembly, electrical and hydraulic wiring, commissioning and final arrangements for the renaturation of the construction site areas.