The new building should accommodate 100 childcare places - 36 nursery children from the first year of life in 3 groups of 12 children each as well as 64 kindergarten children in 4 groups of 16 children. For the crèche groups are to provide bedrooms that are in a suitable way with the group room in connection, that also a use for the other daily routine is possible. Furthermore, the necessary sanitary rooms - in the kigas area they can be combined for each 2 groups - a multipurpose room and the necessary economic areas, office, lounge for up to 20 employees, output kitchen, etc. provided.
Upper cost limit / total approved costs (KG 200-700): EUR 3.1 million gross. The proposed construction project will be funded through the Social City Support Program (SSP).
Specialist planning services of the technical equipment AG 1-3, LP 2-9 for the new construction of a day care center Berthelsdorfer Straße in Freiberg.
The planning beginning from LPH 2 is scheduled for May 2019. Start of construction is for March 2020 and the completion of the construction (existence of the operating permit) is planned for June 2021.
Specialized planning services of the technical equipment AG 4-6, LP 2-9 for the new construction of a day care center Berthelsdorfer Straße in Freiberg.
The planning beginning from LPH 2 is scheduled for May 2019. Start of construction is for March 2020 and the completion of the construction (existence of the operating permit) is planned for June 2021.