The purpose of this work is to improve the existing service networks in the Adosado quay of the Port of Barcelona, moving from the currently available terminal network to a mesh network, and including electricity, drinking water, telecommunications networks, as well as other services that may be needed in the future (such as gas, etc.). The work includes a series of actions that, schematically and classified according to the different areas of action, are the following:On the dock side of the Energy:- New platform reclaimed from the sea.- Connection chamber.- Manholes and pipes to connect with existing service networks. Between the Energy dock and the Adosado pier, below the main navigation channel:- Directed drilling. On the side of the Dock Attached:- New platform of selected material.- Connection chamber.- Manholes and pipes to connect with existing service networks.
The purpose of this work is to improve the existing service networks in the Adosado quay of the Port of Barcelona, moving from the currently available terminal network to a mesh network, and including electricity, drinking water, telecommunications networks, as well as other services that may be needed in the future (such as gas, etc.). The work includes a series of actions that, schematically and classified according to the different areas of action, are the following:On the dock side of the Energy:- New platform reclaimed from the sea.- Connection chamber.- Manholes and pipes to connect with existing service networks. Between the Energy dock and the Adosado pier, below the main navigation channel:- Directed drilling. On the side of the Dock Attached:- New platform of selected material.- Connection chamber.- Manholes and pipes to connect with existing service networks.