Los 41 HLS
Heating equipment:
- Gas condensing boiler system 150 kW
-Electric water heat pump 50kW
-approx. 1500m pipeline
-approx. 180 radiators
-approx. 600m² underfloor heating
Plumbing:
-approx. 65 furnishings
including irrigation and drainage pipes
Ventilation Installation:
1 ventilation unit approx. 5000m³/h including duct system
12 ventilation units approx. 700m³/h decentralised