Scrap wood | Tenderlake

Scrap wood

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
17 May 2019
Closing Date:
31 May 2019
Location(s):
DE136 Schwarzwald-Baar-Kreis (DE Germany/DEUTSCHLAND)
Description:
Supply of woodchips for energy production

Supply of woodchips for heat and steam supply via a biomass boiler (wood chips):

- heat generation with 2 100 kW,

- Steam with 1 100 kW.

The detailed description of the tendered service can be requested from the contact point indicated.

- Quality requirements for industrial wood chips:

Industrial wood chips according to DIN EN ISO 17225-1 Publication date 2014-9, annual delivery volume approx. 10 000 - 17 500 Srm / a Industrial wood chips, the offer is based on an average delivery volume of approx. 14 000 Srm, corresponding to approx. 10 500 MWh. Any additional requirements must be supplied by the supplier. More or less demand does not entitle to charge price surcharges.

Take into account seasonal fluctuations, especially in the summer months less wood chips are removed, since only the high-pressure steam boiler is in operation,

- quality specifications:

Untreated lumpy wood in the form of woodchips in the form of small chips and chips of coniferous and deciduous wood, which has been processed exclusively mechanically.

- Main proportion P45S (3.15

- water content M35-M40 ash content A3.0 (≤3%) calorific value 2.5 to 4.5 kWh / kg,

- Quality control determination:

Moisture content of wood chips when supplied with Humimeter BLL measuring instrument with lancing probe after sampling interval. In case of doubt, the sampling takes place in accordance with LAGA Plan 98 and moisture measurement by fresh mass weighing of the sample, as well as dry matter determination by 24-hour drying in the Darrschrank.

Visual inspection for fines and impurities is carried out at each delivery. In case of dispute by sampling according to LAGA Plan 98 and sieve analysis. In general, the sampling takes place in the presence of the supplier. The supplier may request a partial sample as a reference sample.

The sampling is done randomly or on suspicion principle.

The offer price including all ancillary costs (such as travel etc.) must be stated in EUR per MWh. In the event that the heat meter fails, it will be billed according to the quantity delivered by bulk volume meter (Srm). In the alternative, the Srm price must be indicated.

Consumption measurement is carried out with calibrated heat meters. The meter is read by the contractor in good time before the end of a billing year, together with a representative of the hospital, the values are transmitted monthly by the 5th of the following month,

- Billing:

The billing takes place monthly according to the actual consumption,

- conversion factor:

In the alternative, the following conversion factors are used. 1 m 3 (Volume / solid meter) = 2.5 Srm (Bulk Space Meter) = 750 kWh / Srm,

- failure concept:

By submitting the unit prices, the tenderer must lay down a written default concept in which he describes how the care of the hospital can be ensured. This can be z. B. on a sufficient storage capacity by the supplier or delivery via a subcontractor. Contractual penalty for non or poor performance.

If the supplier (contractor) violates his obligation to perform due to non- or poor performance, he shall bear the additional costs of the replacement delivery and all the associated costs.

Please request the detailed information for the tendered service from the contact point indicated!

Download full details as .pdf
The Buyer:
Schwarzwald-Baar Klinikum Villingen-Schwenningen GmbH
CPV Code(s):
03417000 - Scrap wood