Electrical wiring and fitting work | Tenderlake

Electrical wiring and fitting work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
21 April 2021
Closing Date:
18 May 2021
Location(s):
DE80O Ludwigslust-Parchim (DE Germany/DEUTSCHLAND)
Description:
Ludwigslust-Parchim district - high school school center "Fritz Reuter", partial new building, house 3 - lot 45 - electrical installations and communication technology, 19303 Dömitz

Lot 45 - electrical installations and communication technology.

Building data House 3, part of the new building:

- External dimensions L x W: approx. 57.5 mx 20.5 m, approx. 4 054 sqm (GFA),

- 3 floors without a basement and transition area to the existing building 3,

- a bridge made of steel construction on the 2nd floor as a connection to house 2

- Flat roof with parapet.

Type and scope of services Lot 45:

- Installation of a complete electrical system for the building 3, partially new building with the connection of the partial systems (EDP, BMA, EMA) to the existing systems in building 2, building 3

Mod. And House 1,

- Electrical sub-distributions in the floors (3 pieces) with integration of the NSHV in the regional school building 3 (technical room ground floor),

- sub-distributions for the selected specialist rooms (3 pieces),

- Risers for electrical, EDP, burglar alarm systems as well as for fire alarm systems and safety lighting, partly in E30,

- General electrical installation, including route construction with collective holder in the

False ceiling; vertical BR duct installation behind the panels and screed-covered

Floor duct system with FB tanks in the classrooms (14 rooms),

- Surge protection system type 1, 2 and 3 for electrical and telecommunications technology,

- KNX control for the lighting in the 2 stairwells and in the classrooms,

- KNX control of the sun protection system in 2 specialist rooms,

- Lighting: recessed LED lights in the corridors, classrooms, meeting rooms, etc .; Switching via presence detector or via switches / buttons on site,

- Installation of emergency lighting with central battery, nominal operating time 3 h,

- Assembly of an EDP and telecommunication system according to the media development concept,

- Transmission networks: delivery and installation of the LAN barrier (4 pieces), 1 of which has an air conditioning unit; approx. 440 data points; IT room with 30 workstations; WLAN in the classrooms, preparation rooms, hallways and outdoors,

- Centrally controlled clock system (DCF) in the corridors: with master clock and 6 double clocks,

- Installation of a fire alarm system as a house alarm system (full protection with alarm). The security service is activated via the redundant connection to the fire alarm system in house 2

Produced.

- Installation of a burglar alarm system with 5 security areas, trap surveillance with motion detectors on the floors, in the corridors, in the technical rooms and other selected rooms. All windows on the ground floor are monitored for opening and closing, and all rooms on the ground floor are monitored with motion detectors. The connection to the security service is established via the redundant connection to the EMA in house 2.

- fire protection measures,

- Lightning protection system: discharges behind the clinker brick facade, separation points on the roof.

Lightning protection system on flat roof.

Download full details as .pdf
The Buyer:
Landkreis Ludwigslust-Parchim — vertreten durch: Landrat Stefan Sternberg
CPV Code(s):
45311000 - Electrical wiring and fitting work