Work 2011.001 fixed installations.
- Flat wall protection made of full HPL panels, approx. 950.0 m
- Wall protection in hallways 800 mm high, approx. 2 200.0 running meters;
- wooden handrails in hallways, approx. 650.0 m;
- various fittings such as window sills, bathroom furniture with glass partitions, benches, etc., approx. 85 pieces;
- Built-in furniture such as patient cupboards, office cupboards, cloakroom cupboards etc. approx. 800.0 m
- Fitted kitchens including built-in appliances, 12.0 pieces;
- Facilities of the sister bases with glass walls, counters.
Base and tall cabinets etc. 4.0 pieces:
- Rope safety system for window cleaning, approx. 98.0 pieces.
Period:
- Creation of the W + M planning: 12.10.2020-27.11.2020;
- Installation of lifeline system: 11/16/2020 - 11/27/2020;
- Installation of flat wall protection: 7.12.2020-29.1.2021;
- Installation of built-in furniture: 1.2.2021-26.2.2021;
- Installation of sister bases: 1.3.2021-26.3.2021;
- Installation of wall protection in hallways: 29.3.2021-30.4.2021.