Framework agreement with several economic operators
Maximum number of participants in the planned framework agreement: 2
Lot 1-2:
Client Stadtwerke Witten GmbH.
Civil engineering, pipe and cable construction work in the supply area of Stadtwerke Witten GmbH for measures in the electricity, gas and water network up to an imputed external service sum of a total of 60,000 EUR
- on the basis of the framework contract prices for this lot,
- for each overall individual measure including on-call duty and troubleshooting.
Estimated total value under II.1.5)
Approximately net per year (average of the last few years plus the estimated amount for the increase in the tender limit, this can be fallen short of or exceeded).
Stadtwerke Witten GmbH, lot 1 - Witten North districtCivil engineering, pipe and cable construction work in the supply area of Stadtwerke Witten GmbH in lot 1 "Stadtwerke Witten GmbH, Witten North District" for measures in the electricity, gas and water network up to an imputed external service sum of a total of 60,000 EUR - based on the Framework contract prices for this lot - for each individual measure including on-call service and troubleshooting.
For the geographical allocation of the lots, the application form to be requested contains plans from which the geographical allocation can be seen.
Estimated total value:
Approx. Net per year (average of the last few years plus the estimated amount for the increase in the tender limit, this can be fallen below or exceeded.)
Stadtwerke Witten GmbH, Lot 2 - District Witten SouthCivil engineering, pipe and cable construction work in the supply area of Stadtwerke Witten GmbH in lot 2 “StadtwerkeWitten GmbH, District Witten Süd” for measures in the electricity, gas and water network up to an imputed external service sum of a total of 60,000 EUR - based on the framework contract prices this lot
- for each overall individual measure including on-call duty and troubleshooting.
For the geographical allocation of the lots, the application form to be requested contains plans from which the geographical allocation can be seen.
Approximately net per year (average of the last few years plus the estimated amount for the increase in the tender limit, this can be fallen short of or exceeded).