— 1 450 m
— 55 tons of asphalt departure,
— take 6 185 m
— 1 900 m
— pick up 2 465 m of deep curbs,
— 1 psch demolition of a garden shed,
— 10 000 m
— 3 pcs. water connection bollard,
— 3 pcs. power connection bollers,
— 241 m angled support wall H=55 cm,
— 133 m angled support wall H=105 cm,
— 24 m
— 2 perforated structures as precast reinforced concrete structures,
— 20 m fall protection,
— 1 200 m
— 1 St. Teichmönch,
— 860 tons of river gravel,
— 1 000 m
— 1 drain controller with precast reinforced concrete shaft,
— 73 m PP pipe DN 300,
— 4 trays DN 1000,
— 2 545 m
— 4 865 m
— 4 090 m
— 910 m
— 225 m
— 170 m
— 900 m
— 516 m steel edging,
— 795 m
— 100 m
— 175 m
— 60 m row of natural stone blocks for sitting and playing,
- 19 pcs of benches,
— 10 pieces waste bins,
— 6 pcs bicycle chair,
— 2 pcs. shut-off bollards,
— 3 x prefabricated reinforced concrete barbecue areas,
— 3 pcs. large umbrellas 7x5 m,
— 32 play and sports equipment,
— 1 mini golf course with 18 lanes,
— supply and cover 2 530 m
— 66 pcs. new tree plantings,
— 2 895 m
— 20 350 m
Landscaping works for the 2nd construction phase of the overall measure "Umgestaltung Wiehlaue" in the northern and western parts of the old spa gardens are tendered as part of the ISEK Wiehl Center with the following main services:
- 120 t asphalt rubble,
— pick up 420 m
— pick up 285 m
- 1 100 m
- 60 m
- 55 m
- 30 m
- 1 pc water connection bollard,
- 92 m
- 6 floor recessed lights,
- 1 pc power connection bollard,
- 24 m
- 57 seat blocks and slabs as precast concrete parts,
- 37 m concrete block steps,
- 860 m
- 1,970 m
- 1 000 m
- 880 m
- 120 m
- 320 m
- 22 pcs of benches,
— 4 pieces waste bins,
— 11 St bicycle chair,
— 4 pcs steel handrails,
- 18 new tree plantings,
- 1 210 m
- 1 300 m