The district of Fürstenfeldbruck plans to demolition of the existing gymnasiums on the site of
Puchheim school centre and then the new construction of a double and a triple gym.
Demolition of concrete block coverings to approx. 200 sqm
Release asphalt surface and descence approx. 290 to
loosen and dispose of soil approx. 2,000 cbm
loosen soil, interim storage and reinstall approx. 1,000 cbm
Rainwater purification shafts in total approx. 26 pcs.
drainage channel NW 100 approx. 210 m
drainage channel NW 100 m. thighs approx. 10 m
Manufacture of asphalt surfaces approx. 980 sqm
Manufacture of lawn paving slabs approx. 500 sqm
Making square surfaces with polygonal concrete slabs approx. 4,600 sqm
Manufacture of plastic covering approx. 330 sqm
Installation ball catcher fence, height = 400 cm approx. 75 m
Installation rotary wing gate for ball catcher fence 1 pc.
Installation of bicycle bushes 500 pcs.
Installation of reinforced concrete tree discs 13 pcs.
Installation of wood pads for seat elements made of precast concrete elements approx. 75 m
Manufacture of edging from precast concrete components as a custom-made product, partly with
seating elements approx. 440 m
Manufacture of edging from L-stone approx. 42 m
excavate and fill tree pits 37 pcs.
Manufacture of lawns including earthworks approx. 740 sqm
Topsoil for lawns deliver approx. 150 cbm
Topsoil for vegetation areas provide approx. 280 cbm
Tree pit substrate (A and B) deliver approximately 420 cbm
Planting large shrubs in green areas 24 pcs.
Planting large shrubs including underground tree anchors 13 pcs
Production of vegetation areas including perennial planting approx. 1,440 sqm
Lawn sowing approx. 740 sqm
Lawn Seed Lawn Liner Pitchs/Escape Route approx. 310 sqm
Restoring lawn approx. 315 sqm
all planting work including completion care (1 year) and development care (2 years)