Electro engineering installation works for the new pump station PV Stokke. The Pump station is situated at Vestfold vann's Ø1000 water main. 2 pumps as a well as a backup a power supply generator shall be installed. Pumps and the back-up power generator shall supply Laholm elevated basin through an Ø400 supply branch line.
The building has a base area of 70 m