The tile and panel work for the practical part of the vocational school Höchstädt (in 2 construction phases) consists of tile work on floors and walls of sanitary areas.
The practical part (building height approx. 13.50 m) in BA 1a consists of a 3-storey building with workshops and classrooms and one sanitary area per floor. ON the ground floor, the workshops include appropriate changing areas with showers, which are also tiled.
In BA 1b, a single-storey part of the building with 2 adjacent greenhouses is added. In this construction phase, a sanitary area and barrier-free toilet are also planned.
Short description:
The tile and panel work for the practical part of the vocational school Höchstädt (in 2 construction phases) consists of tile work on floors and walls of sanitary areas.
The practical part (building height approx. 13.50 m) in BA 1a consists of a 3-storey building with workshops and classrooms and one sanitary area per floor. ON the ground floor, the workshops include appropriate changing areas with showers, which are also tiled.
In BA 1b, a single-storey part of the building with 2 adjacent greenhouses is added. In this construction phase, a sanitary area and barrier-free toilet are also planned.
masses:
- Floor tiles + base (10 x10cm): approx. 150m²
- Wall tiles (30x10cm): approx. 170m²
CPV codes:
45431000-7 Floor and tile work
Events:
BA 1a: 4th quarter 2023 (approx. week 43 to week 48)
BA 1b: 2nd quarter 2025 (approx. week 24 to week 27)