The construction project of the publicly accessible administration building consists of three main components: west building with gable roof, central building and east building with flat roof. The main access is via the south side. The floors are of different heights.
West Building:
UG, G, 2 OG and DG, as well as a 4th floor in the attic
Central and eastern buildings:
UG, EG UND 2 AND
Gesamtbaukörper:
Building plot 5.902 m2
BGF 8.175 m2
BRI 34.985 m3
Hauptgeometrie:
Length 78 m
Width 42 m
Depth below ground level up to 8 m
Height above ground up to 21 m (ridge gable roof) and 14 m (OK flat roof attic)
Height of the construction site: approx. 710.50 m above sea level
The construction project of the publicly accessible administration building consists of three main components: West Building
with gable roof, central building and east building with flat roof. The main access is via the south side. The
Floors are of different heights.
West Building:
Basement, ground floor, 2 upper floors and attic, as well as a 4th floor in the attic
Central and eastern buildings:
Basement, ground floor and 2 upper floors
Gesamtbaukörper:
Building plot 5.902 m2
BGF 8.175 m2
BRI 34.985 m3
Hauptgeometrie:
Length 78 m
Width 42 m
Depth below ground level up to 8 m
Height above ground up to 21 m (ridge gable roof) and 14 m (OK flat roof attic)
Height of the construction site: approx. 710.50 m above sea level
Main Use:
In the basement there are technical centres, ancillary rooms and sanitary areas.
All upper floors contain administrative facilities. In the attic there are also
Technikbereiche.
Construction / Supporting structure / support:
Excavation pit shoring anchored back on all sides
Shallow foundation
Reinforced concrete multi-storey construction with timber exterior walls
Steel/timber construction gable roof
Flat roofs as warm roofs
2 stairwells made of reinforced concrete
2 elevators to all floors
Drywall finishing, cavity floors, administrative finishing
MEP expansion with conveyor systems, sewage, water and gas systems, heat supply systems,
Ventilation systems, refrigeration systems, building automation systems, electrical and
telecommunications systems