Intermediate Level Maintenance (ILM) for two (2) KDC-10 aircraft of the RNLAF for an initial period from 1.7.2016 until 31.12.2020.
This period of performance may optionally be extended with two times (2x) six (6) months.
ILM consists of at least the following services:
— Scheduled A- and C-checks including material and parts according to the low utilization program;
— On-site assistance including at the home base Eindhoven Airport and any other location worldwide;
— Drop-in maintenance at Supplier facility on a 24/7/365 basis;
— Over & Above services and Additional work;
— Maintenance Engineering under EASA 145 approval or equivalent.