Kanalerneuerung
210 m DN 1000 STB.
250 m DN 900 STB.
11 shaft structures according to plan,
2 pcs demolition of shaft structures,
4 St. Schachtabbrüche DN 1000,
8 shaft demolitions DN 1000 up to 1.50 m below the top of the terrain,
140 m of existing DN 200 channel pressed with twilight,
130 m of existing DN 400 channel pressed with twilight.
drainage works