The three-winged building complex of the Fichtenberg Oberschule (FOS) consists of
from an east wing, a west wing and a north wing, which are over
a spacious hall (central building) are connected to each other.
The planned construction project includes the building of the Fichtenberg Oberschule
with the exception of the auditorium, the area of mid-level staff 3rd floor and DG and the
Outer shell of the east wing.
The advertised services include construction phase 2
(north wing).
Measures in the north wing:
-Constructive demolition measures with the necessary interceptions.
-Non-constructive demolition work in preparation for follow-up work.
-Disposal of non-hazardous waste.
-Closing of openings in load-bearing and non-load-bearing masonry walls.
-Production of new wall openings in load-bearing and non-load-bearing masonry walls with lintel covering.
-Production of support pockets in masonry walls for subsequent room and reinforced concrete work.
-Manufacture of new load-bearing and non-load-bearing walls made of masonry and reinforced concrete.
-Renovation of steel stone ceilings in existing buildings.
-Lime cement plaster, inside, on walls and ceilings
-Manufacture and closing of openings and slots in ceilings and walls as a construction aid service for the MEP trades.
-Masonry renovation of house sponge
-Wall wech drying and repair
-Making a reinforced concrete staircase in the entrance area, TRH C
-Construction of an elevator underpass in the stair eye basement
-Production of a pump sump made of reinforced concrete
-Manufacture of reinforced concrete beams as coatings
-Manufacture of reinforced concrete ceiling with 5 steps in TRH C, GROUND FLOOR
-Production of reinforced concrete floor slab in TRH C and technical room UG
-Manufacture of concrete foundations
-Earthworks for underpinnings, elevator underpass and new pump sump
-Steel beams to accommodate the on-site elevator shaft construction
-Underpinning of existing foundations