General electrical installation of KG 440 and 450, installation BMA, SAA, transmission grids, fire protection remediation measures.
— 1 x extension safety lighting central battery system,
— 1 pc low voltage main distribution with converter measurement 400A,
- 10 sub-distributors,
— 68 500 m cables and wires 3 x 1.5 to 4 x 95/50 mm² + lines low voltage,
— 1 850 m cable and grid gutters, climb routes; widths 100-600 mm,
— 4,700 m conduits, rigid and flexible,
— 1,500 installation devices AP and UP,
— 1 x sun protection system in conjunction with KNX components,
— 1 350 luminaires: pendant luminaires, recessed and surface-mounted luminaires, luminaires for emergency lighting,
— 1 x lightning protection system with 1 300 m cables,
— 3 pcs emergency call facilities disabled toilet,
— 1 pc fire alarm system with control panel and 310 pcs automatic+non-automatic detectors,
— 1 pc voice alarm system with central, 5 amplifiers a. 500W and 300 pcs speakers,
— 31,000 m transmission grids with CAT lines, 7 network enclosures up to 42 U,
— 1 x fire protection remediation measures: fire protection products, I30 cladding subsequent cable fasteners of existing pipes,
— 1 x construction power supply, construction lighting, dismantling work, ancillary services.