The project consists of 3 different object parts.
- Sports and infrastructure building (SIGB)
This stilted building has 10 large changing rooms with communal showers and toilet facilities on the ground floor. On the upper floor there is the restaurant and a spacious, partially covered terrace and a fully covered grandstand.
- Parking and sports facility (PASA)
The partly underground parking facility, which is also pinned, offers around 146 covered parking spaces on approx. 4,800 m
- Street work facility
Public street work facility.
Sports and infrastructure buildings as well as parking and sports facilities:
Pile system:
Driven displacement piles Ø350 / Ø450 / Ø550
Post lengths: approx. 28 to 34 m
Posts: approx. 420 pcs.
The project consists of 3 different object parts.
- Sports and infrastructure building (SIGB)
This stilted building has 10 large changing rooms with communal showers and toilet facilities on the ground floor. On the upper floor there is the restaurant and a spacious, partially covered terrace and a fully covered grandstand.
- Parking and sports facility (PASA)
The partly underground parking facility, which is also pinned, offers around 146 covered parking spaces on approx. 4,800 m
- Street work facility
Public street work facility.
Sports and infrastructure buildings as well as parking and sports facilities:
Pile system:
Driven displacement piles Ø350 / Ø450 / Ø550
Post lengths: approx. 28 to 34 m