The subject of the contract is the design and construction of a second carriageway on a section of the existing ring road. Kępno along the S11 road from km about 8+500 (according to DŚU 0+000) to km approx. 12+177 (according to DŚU 3+677) – on the border of plots 1324/7 and 1322/10. The above section is located in the Wielkopolskie Voivodeship, in the Kępno poviat, in the Kępno and Baranów communes
The Contracting Authority reserves the obligation for the Contractor to personally perform key tasks, i.e. the surface of the main route, including the manufacture and incorporation and execution of the remaining layers of the surface structure above the native soil (excavation) or embankment (embankment), excluding the supply of materials and services
The subject of the contract is the design and construction of a second carriageway on a section of the existing ring road. Kępno along the S11 road from km about 8+500 (according to DŚU 0+000) to km approx. 12+177 (according to DŚU 3+677) – on the border of plots 1324/7 and 1322/10. The above section is located in the Wielkopolskie Voivodeship, in the Kępno poviat, in the Kępno and Baranów communes