PART No. I – southern:
winter maintenance of roads 143,746 km
winter maintenance of sidewalks with an area of 90 060.59 m2
organizational and technical activities
preparation of materials for the removal and prevention of slipperiness
removal of snow from the roads
removal of snow from pavements
removal of winter slipperiness from roads by using chemical agents or non-chemical (colouring) materials
removal of slipperiness from sidewalks
cleaning works after the winter season (cleaning of roads and pavements after winter)
PART No. II – northern:
winter maintenance of roads with a length of 105,589 km
winter maintenance of sidewalks with an area of 26 301.60 m2
organizational and technical activities
preparation of materials for the removal and prevention of slipperiness
removal of snow from the roads
removal of snow from pavements
removal of winter slipperiness from roads by using chemical agents or non-chemical (colouring) materials
removal of slipperiness from sidewalks
cleaning works after the winter season (cleaning of roads and pavements after winter)
PART No. I – southernPART No. I – southern:
winter maintenance of roads 143,746 km
winter maintenance of sidewalks with an area 90 060,59 m2
organizational and technical activities
preparation of materials for the removal and prevention of slipperiness
removal of snow from the roads
removal of snow from pavements
removal of winter slipperiness from roads by using chemical agents or non-chemical (colouring) materials
removal of slipperiness from sidewalks
cleaning works after the winter season (cleaning of roads and pavements after winter)
in accordance with ANNEX No 3A.
There may be periodic shutdowns of road fragments No:
2910S Przyszowice - Chudów from km 0+845 to km 3,000, length approx. 2.16 km
2916 Smolnica -Sośnicowice from km 7+282 to km 9+368, length approx. 2 km
2927S Olchowa Street in Żernica approx. km 2+300 to 2+825, length approx. 0.5 km
The Contractor will be informed about the existing exclusions in writing.
It is estimated that as part of the Winter Action there will be:
conducting an active action of winter road maintenance 30 days
conducting an active action in the field of winter maintenance of sidewalks 5 days
conducting passive action of winter maintenance of roads and pavements 111 days
conducting the "ice" action (combating slipperiness on all roads covered by winter maintenance) 10 days;
As part of the subject of the contract (conducting the Winter Action), the concepts of active winter road maintenance, active winter pavement maintenance, "black ice" action and passive winter road and pavement maintenance are used.
Active action is understood as performing activities related to maintaining passability by removing snow and combating slippery slopes in accordance with the detailed technical specification of proper performance and acceptance of works - winter maintenance of roads and sidewalks (Annex 2 to the contract) and a list of winter maintenance standards for district roads and sidewalks (Annex 1 to the contract).
The Contractor's commencement of work from the introduction of an active action by an authorized person of the Contracting Authority or the Director of ZDP will take place up to a maximum of 2 hours. The time of starting work is one of the criteria for selecting the offer.
Passive action is understood as maintaining the equipment in the so-called readiness, operation of the dispatch point, patrolling roads and sidewalks and intervention snow removal or combating slippery slopes at the request of the Ordering Party or in cases found during patrolling - applies to an area with a very limited range.
The unit price for a passive share may not exceed 10% of the unit price for an active share carried out on the roads.
The action "black ice" is understood as combating slippery conditions on all county roads only by sprinkling them with salt (without rinsing). As part of this action, the contractor is obliged to sprinkle salt on all county roads twice a day along the entire width. From the moment of launching the above-mentioned action, the contractor will proceed to the first sprinkling of roads within the time specified in the contract, while the contractor will start the second sprinkling at the time indicated by the Contracting Authority.
The unit price for the "ice" share may not exceed 70% of the unit price for an active share conducted on the roads.
The provision of winter maintenance services for sidewalks shall be understood as:
a) combating slipperiness by sprinkling sand or in the event of very difficult winter conditions with the consent of the Ordering Party with a sand-salt mixture in the ratio of 1:1 pavement surface using a self-propelled spreader or mounted on a vehicle adapted to move on sidewalks,
(b) snow removal of pavement pavements using a vehicle used for mechanical snow removal of pavement with an acceptable total weight of up to 2.5 tonnes (vehicles must not damage pavement, curbs, etc.),
(c) the maintenance of the equipment and machinery intended for the execution of this contract with their operation,
(d) the Contractor's own provision of repair and repair equipment provided for the provision of services by the Contractor.
PART No. II – northernPART No. II – northern:
winter maintenance of roads with a length of 105,589 km
winter maintenance of sidewalks with an area of 26 301.60 m2
organizational and technical activities
preparation of materials for the removal and prevention of slipperiness
removal of snow from the roads
removal of snow from pavements
removal of winter slipperiness from roads by using chemical agents or non-chemical (colouring) materials
removal of slipperiness from sidewalks
cleaning works after the winter season (cleaning of roads and pavements after winter)
in accordance with ANNEX No 3B.
There may be periodic shutdowns of road fragments No:
2918S from km 19+245 to km 20+258 and from km 22+035 to km 22+510, length about 1.8 km
2960S from km 2+434 to km 3+402, length approx. 0.968 km
The Contractor will be informed about the existing exclusions in writing.
It is estimated that as part of the Winter Action there will be:
conducting an active action of winter road maintenance 30 days
conducting an active action in the field of winter maintenance of sidewalks 5 days
conducting passive action of winter maintenance of roads and pavements 111 days
conducting the "ice" action (combating slipperiness on all roads covered by winter maintenance) 10 days;
As part of the subject of the contract (conducting the Winter Action), the concepts of active winter road maintenance, active winter pavement maintenance, "black ice" action and passive winter road and pavement maintenance are used.
Active action is understood as performing activities related to maintaining passability by removing snow and combating slippery slopes in accordance with the detailed technical specification of proper performance and acceptance of works - winter maintenance of roads and sidewalks (Annex 2 to the contract) and a list of winter maintenance standards for district roads and sidewalks (Annex 1 to the contract).
The Contractor's commencement of work from the introduction of an active action by an authorized person of the Contracting Authority or the Director of ZDP will take place up to a maximum of 2 hours. The time of starting work is one of the criteria for selecting the offer.
Passive action is understood as maintaining the equipment in the so-called readiness, operation of the dispatch point, patrolling roads and sidewalks and intervention snow removal or combating slippery slopes at the request of the Ordering Party or in cases found during patrolling - applies to an area with a very limited range.
The unit price for a passive share may not exceed 10% of the unit price for an active share carried out on the roads.
The action "black ice" is understood as combating slippery conditions on all county roads only by sprinkling them with salt (without rinsing). As part of this action, the contractor is obliged to sprinkle salt on all county roads twice a day along the entire width. From the moment of launching the above-mentioned action, the contractor will proceed to the first sprinkling of roads within the time specified in the contract, while the contractor will start the second sprinkling at the time indicated by the Contracting Authority.
The unit price for the "ice" share may not exceed 70% of the unit price for an active share conducted on the roads.
The provision of winter maintenance services for sidewalks shall be understood as:
a) combating slipperiness by sprinkling sand or in the event of very difficult winter conditions with the consent of the Ordering Party with a sand-salt mixture in the ratio of 1:1 pavement surface using a self-propelled spreader or mounted on a vehicle adapted to move on sidewalks,
(b) snow removal of pavement pavements using a vehicle used for mechanical snow removal of pavement with an acceptable total weight of up to 2.5 tonnes (vehicles must not damage pavement, curbs, etc.),
(c) the maintenance of the equipment and machinery intended for the execution of this contract with their operation,
(d) the Contractor's own provision of repair and repair equipment provided for the provision of services by the Contractor.