Open call for tenders on a firm basis.
South part (connection to the RD92 roundabout - RD8 roundabout) and two optional sections TO001 RD92 and TO002 roundabout.
North part (A64 roundabout - RD92 roundabout connection).
Variants allowed. Mandatory site visit. In the event of recovery of the installments over time, the overall minimum duration planned for the execution of all the services is fourteen months (1.5 months of preparation + 12.5 months of execution of the site).