Placing a temporary passerelle over the tracks.
Widening existing Silvertop bridge over the tracks with new fixed stairs and lifts to the platforms that give access from the bridge. Ensure integral accessibility.
Placing new shelters on the platforms and partly renewing technical installation.
Placing camera surveillance.
New tender after change scope (awning removal) and cessation previous procedure. inclusion of the temporary passerelle in the tender.
Renovation of the floor access with elevators and stairs