Wing M – Heating and ventilation of the main structure of Wing M
The main structure of the new building project of Wing M is almost completed. However, the further development of the building can currently only take place once executing contractors have been found and commissioned. In order to avoid damage caused by weather conditions, the building must be heated, i.e. to prevent the interior walls from becoming too cold during the winter and then, the following spring/summer, the warm humid outside air from condensing on the cold walls.
The measure must be taken to protect already installed components (ventilation duct parts, gas piping, coating or paint, walls, ceilings and floors).