Electrical installation work of heating and other electrical building-equipment | Tenderlake

Electrical installation work of heating and other electrical building-equipment

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
26 November 2021
Closing Date:
23 December 2021
Location(s):
DEA47 Paderborn (DE Germany/DEUTSCHLAND)
Description:
A.V.E. - New building district building yard Paderborn, building automation

building automation

The building plot measures around 17,000m² and is located in the immediate

Neighbourhood to the disposal center “Old Ski Jump” in 33106 Paderborn.

A.V.E's own company in the district of Paderborn builds the

New construction of the central district building yard.

This is a building complex consisting of several buildings

different uses. The buildings have an approximate

GFA of approx. 4,000 m² plus necessary ancillary areas and outdoor facilities.

All of them were built before construction began. Removes construction loads and paved up construction roads.

There are various newly installed pipelines on the building plot.

Building description:

The district building yard is divided into six components:

- Social area/administration (VW)

- workshop (WE)

- Vehicle hall (FH)

- salt hall (SA)

- Heating centre/carport (CA)

- outdoor area (AL)

building automation

A higher-level building automation system is to be set up

Building automation focuses on information for the property

in the buildings:

· administration

· workshop

· Heating center

intended.

Note: The following points are additions to the general technical terms and conditions of VOB part C.

1 Laws-regulations-guidelines-technical regulations

The following technical regulations are based on the (applicable) following technical regulations for the creation of ventilation and cooling systems and all related services:

- the legal regulations

- the technical regulations that document the current state of the art

(EN, DIN, VDI, VDE, DVGW-TRGI, etc.)

- accident prevention regulations, in particular those of professional associations

and the Workplace Ordinance

- Any technical notes accompanying the call for tenders

building automation

DIN EN 15232 Energy efficiency in buildings - Impact of building automation

and building management

DIN EN ISO 16484 parts 1-3, 5+6 building automation systems

VDI 3813 Part 1 Building automation (GA) — Basics of room automation

VDI 3813 Part 2 Building Automation (GA) — Room Automation Functions

(RA functions)

VDI 3813 Part 3 Building automation (GA) — application examples for

Room types and function macros in room automation

VDI 3814 Part 1 Building automation (GA) - System basics

VDI 3814 Part 2.2 Building automation (GA) system integration and

interfaces

Automation equipment (KG 481)

Automation systems are used that control

ventilation, heating and cooling systems.

The heat generators (currently planned wood chip boilers) receive

manufacturers' manufacturer-specific regulations.

Hardware data points only provide information and

Replaced the approvals/closures with the district heating building automation system.

For more information, see specifications in the tender documentation (C documents)

Download full details as .pdf
The Buyer:
Abfallverwertungs- und Entsorgungsbetrieb Kreis Paderborn
CPV Code(s):
45315000 - Electrical installation work of heating and other electrical building-equipment