building automation
The building plot measures around 17,000m² and is located in the immediate
Neighbourhood to the disposal center “Old Ski Jump” in 33106 Paderborn.
A.V.E's own company in the district of Paderborn builds the
New construction of the central district building yard.
This is a building complex consisting of several buildings
different uses. The buildings have an approximate
GFA of approx. 4,000 m² plus necessary ancillary areas and outdoor facilities.
All of them were built before construction began. Removes construction loads and paved up construction roads.
There are various newly installed pipelines on the building plot.
Building description:
The district building yard is divided into six components:
- Social area/administration (VW)
- workshop (WE)
- Vehicle hall (FH)
- salt hall (SA)
- Heating centre/carport (CA)
- outdoor area (AL)
building automation
A higher-level building automation system is to be set up
Building automation focuses on information for the property
in the buildings:
· administration
· workshop
· Heating center
intended.
Note: The following points are additions to the general technical terms and conditions of VOB part C.
1 Laws-regulations-guidelines-technical regulations
The following technical regulations are based on the (applicable) following technical regulations for the creation of ventilation and cooling systems and all related services:
- the legal regulations
- the technical regulations that document the current state of the art
(EN, DIN, VDI, VDE, DVGW-TRGI, etc.)
- accident prevention regulations, in particular those of professional associations
and the Workplace Ordinance
- Any technical notes accompanying the call for tenders
building automation
DIN EN 15232 Energy efficiency in buildings - Impact of building automation
and building management
DIN EN ISO 16484 parts 1-3, 5+6 building automation systems
VDI 3813 Part 1 Building automation (GA) — Basics of room automation
VDI 3813 Part 2 Building Automation (GA) — Room Automation Functions
(RA functions)
VDI 3813 Part 3 Building automation (GA) — application examples for
Room types and function macros in room automation
VDI 3814 Part 1 Building automation (GA) - System basics
VDI 3814 Part 2.2 Building automation (GA) system integration and
interfaces
Automation equipment (KG 481)
Automation systems are used that control
ventilation, heating and cooling systems.
The heat generators (currently planned wood chip boilers) receive
manufacturers' manufacturer-specific regulations.
Hardware data points only provide information and
Replaced the approvals/closures with the district heating building automation system.