Preparatory civil engineering and dismantling work as part of renovation and conversion measures in a historic building
125 m3 of excavated earth;
38 m3 dismantling of natural stone walls and staircases;
20 m2 demolition terrace;
30 m3 concrete demolition reinforced concrete slab terrace;
15 m3 Suchgraben;
310 m2 of pavement dismantling and ballast substructure;
make 30 m2 of flat surface;
make 15 m3 of antifreeze layer;
350 t material transport.