Procedure managed with telematic systems in special sectors, aimed at stipulating a contract for the assignment of the supply and installation of two charging systems for electric traction buses in the SETA S.p.A. plants in Via del Chionso 50, Reggio Emilia and Via Arda 21, Piacenza.
The procedure is financed from the resources for the implementation of the investments of the PNRR and the NSDP Cities over 100,000 inhabitants.
The contract involves the supply and installation of two charging systems for electric buses at the SETA S.p.A. plants in Via del Chionso 50, Reggio Emilia and Via Arda 21, Piacenza. The plants are designed, beyond mere geometric differences due to the individual sites, in a mirrored way, with the same performance and the same components (medium voltage switchboards, low voltage switchboards, chargers, prefabricated cabin, etc.) such as to be configured as a single project even if territorially distributed. The estimated value of the cost of building the Reggio Emilia plant, which is currently being finalized, is estimated at EUR 1 614 829.14 (including the non-discounted security charges of EUR 14 616.01). The presumed value of the cost of the construction of the Piacenza plant, in the final processing phase, is estimated at
EUR 1 434 113.89 (including security charges not subject to reduction of EUR 10 336.30). The grand total for the supply and installation of the two charging facilities is therefore EUR 3 048 943.03 (excluding VAT).
The procedure is financed from the resources for the implementation of the investments of the PNRR and the NSDP Cities over 100,000 inhabitants.