Project: Renovation of the sprinkler subcenter connection in the JKH, performance profile: planning services KGR 410 to 480 (except 460) in LPH 2 to 9 with a focus on KGR 475 fire extinguishing systems VGV-36-2670/21

see II.2.4 - description of procurement

1. Information on the construction project

- General description:

The Jakob Kaiser House, the largest new parliament building, was completed in December 2001. It mainly serves to house around 60 percent of the representative offices, parliamentary groups and their meeting rooms, the work spaces of the vice-presidents, and the disposal rooms for the Federal Council and the Federal Government. The offices of the parliamentary services, the press centre of the German Bundestag, media services, two meeting rooms for committees of inquiry and other infrastructural areas of use are also located here.

During construction, the individual houses were designed by four different architectural offices. (House 1 and 2: Schweger & Partner, houses 3 and 7: Busmann+Haberer, houses 4 and 8: Gerkan, Marg and Partner, House 5 and 6: de Architekten Cie, Reich Presidents Palace: Van den Valentyn).

Underground, a utility tunnel connects the JKH with other Bundestag buildings. Two bridges above ground provide the connection between the building complexes located on both sides of the Dorothetrasse. Houses 1 and 5 and 4 and 8 are also connected by pedestrian tunnels.

- Client/user:

Federal Ministry of the Interior/German Bundestag

- Building use:

Use as an office building for all political groups and disposal rooms for the Federal Council.

Note: Person verification by the German Bundestag is required to enter the property. For more information, see the Personal Verification Annex.

- type of construction project:

Renovation of the corroded fire extinguishing system with conversion and extension part

- Project costs (net) for KG 410-480 (except 460) in accordance with DIN 276:

The estimated project costs including MvB amount to €569,847.00 of which for KGR 475 in accordance with DIN 276: €381,488.00.

- Project duration (LPH 2-9):

approx. 4th quarter 2022 to 4th quarter 2030

2. Subject of the order

Power range:

Technical equipment according to DIN 276 in:

KGR 410 to 480 (except 460) with planning focus on KGR 475 fire extinguishing systems.

- Performance picture:

According to DIN 276 for the cost groups 410, 420, 430, 440, 450 and 480 in the HOAI service phases 2-9 with basic services and special services:

- Temporary dismantling of colliding plant components and devices, provisional solutions, replacement and commissioning in accordance with generally accepted technical rules, as well as after completion of work on the sprinkler system

In accordance with DIN 276 for cost group 470 usage-specific and process engineering plants

Here: Cost group 475 fire extinguishing systems in the HOAI service phases 2-9 with basic services and special services:

- Inventory and comparison with the inventory documents regarding the line layout, system components and components of the BMA, if necessary, updating with a focus on the ongoing planning phases.

- Planning and conversion - as well as partial expansion of the existing fire extinguishing system in the JKH are included and highlighted, in addition to the basic services of HOAI, in particular:

- a concept for ensuring fire protection when the fire extinguishing system is taken out of service in rooms and parts of buildings

- a concept to implement the most continuous action possible in a very limited period of time and under conditions of construction in existing and operational conditions

- compliance with fire safety requirements in the possibly new line run of the fire extinguishing line

- The inventory pipe network calculation must only be checked if the fire extinguishing system needs to be rebuilt if absolutely necessary

- participation on site in tests and approvals by the expert for fire extinguishing systems, if necessary, partial acceptance of the self-contained construction phases

- the re-commissioning of the system, including monitoring of a cross-trade operative principle test

A comprehensive performance chart for the individual cost groups can be found in the enclosed service description

- Start/end of service provision (LPH 2-8):

4th quarter 2022 to 4th quarter 2029

- Duration of the contract/framework agreement (from the date of contract LPH 2-9 including rifle power):

Duration in months: 96

A comprehensive performance picture for the individual cost groups can be found in the enclosed service description.

A gradual award of the services is planned. However, there is no legal claim to the transfer of all services.

Download full details as .pdf
The Buyer:
Bundesrepublik Deutschland, vertreten durch das Bundesministerium des Innern, für Bau und Heimat, vertreten durch das Bundesamt für Bauwesen und Raumordnung
CPV Code(s):
71000000 - Architectural, construction, engineering and inspection services
71300000 - Engineering services
71321000 - Engineering design services for mechanical and electrical installations for buildings