The city of Bühl is planning a new building adjacent to the children's and family centre on Luisenstraße for
the existing school campus with a canteen, a student café and classrooms for the neighbouring
Aloys-Schreiber-Schule and the Carl-Netter-Realschule. The new building has three floors and a partial basement.
On the 1st floor there is a large roof terrace. The building is built in solid construction in reinforced concrete
, the ground floor ceiling in some areas and the roof with hollow core prestressed concrete elements. Due to the
Arrangement of the building in the existing street space, the proximity to pipeline routes in the street and
According to the geological conditions, the basement is constructed as a white tank in WU concrete. The
Construction pit is made on two sides of the new building (facing the street) with a shoring without working space.
For the foundation of the structure, soil improvement is required. The façade is designed as a curtain
Clinker façade. Glazing in wood-aluminium construction on the ground floor and to the roof terrace
as mullion-transom construction on the upper floors as perforated elements. The roof is flat and preserves
extensive greening. The adjacent outdoor facilities will be redesigned and trees planted. To
On the 1st floor of the neighbouring building Kifaz, an open connecting walkway is being built in steel construction. That
Building is constructed to passive house standard. The gross floor area of the new building is 1,722 m2, the
Bruttorauminhalt 7.900 m3.
ca. 1 St Mobile Trennwandanlage
Width 11460 mm, height to UK suspended ceiling 3185 mm, thickness 100 mm,
7 Normalelemente, 1 Teleskopelement, 1 Wandanschlusselement,
1 fixed element, partitioning over running rails,
element cladding made of wood-based panels,
Surface with HPL laminate panels, manual operation,
Rail stopper with control rod.