TrueBPL. Bergen, SB 11, expansion with SPA 2, explosive ordnance clearance phase C
expansion shooting range 11 with SPA 2:
explosive ordnance clearance phase C according to BFR KMR. Due to this very high load, the most economical method for clearing the area according to BFR-KMR and DGUV information 201-027 is volume clearance by means of separation (DGUV 201-027, section E, p.18). The study area will be divided into room cells with an area of approximately 340,000 m². In advance, visual inspection of green and heathland areas as well as probing for large-caliber ordnance is carried out. After separation, a re-probing is carried out. The floor material can then be reinstalled. During construction, ordnance clearance in areas where probing is not possible.