Installation of steel stairs, grilles and cellar door, fall protection on windows inside
S-389 Locksmith work BT. A to F, N
Installation of steel stairs, some with concrete block covering; Fall protection on the inside of windows, grilles and a cellar door
- 1 piece metal staircase with dismantling function
- 1 piece metal staircase with concrete block covering, stone staircase as an external staircase to the main access OG BT E
- 128 fall protection devices on the inside of windows or in the space between the windows
- Cellar exterior door as lattice door
- Kellergitter
Construction of the trade is scheduled to begin in week 39 2023. The construction process will be staggered according to components, completion by week 48 2024.
Staggered journeys are required for the provision of services.