Design and construction of the S19 expressway on the Lutcza section — in Domaradz (with junction) length approx. 6.43 km
The subject of the Order is:
"Design and construction of the S19 expressway on the section Lutcza - w. Domaradz (with a junction) length approx. 6.43 km"
Broken down into sections of works:
Section 1: Design and construction of the S19 expressway on the Lutcza section –
in. Domaradz (without node).
To the extent of an order outside of Episode 2.
Section 2: Design and construction of the S19 expressway on the section w. Domaradz (with interchange) - up to km 44+878,73.
As part of Episode 2, the following should be performed:
1) node "Domaradz",
2) section of the S19 expressway from km 43+900 to km 44+878.73 (the end of the section covered by the Contract).
For points 1) and 2) it is necessary to obtain a decision on the occupancy permit for the roadway of the S class road under construction, in the cross-section indicated in the Requirements of the Ordering Party.
The contracting authority stipulates that the above-mentioned decisions are to enable the use of the S-19 road on the section from the Domaradz junction to km 44+878.73 immediately after their issuance (they may not make their use dependent on the performance of any construction works referred to in Article 59 paragraph 2 of the Construction Law).
As part of the contract, the following should be designed and built:
• an expressway with a dual carriageway cross-section, approx. 6.43 km long;
• road junction: "Domaradz";
• Road Maintenance Circuit (OD) "Domaradz";
• Two-nave road tunnel T-3 running under Mount Hyb, 0.99 km long;
• Tunnel Management Centre with equipment;
• technical buildings at the tunnel with equipment;
• road engineering facilities;
• reconstruction of existing roads in terms of collision with route S19;
• additional roadways serving the adjacent area;
• technological belts;
• technical roads;
• infrastructure for pedestrians and cyclists;
• environmental protection devices including animal passages;
• acoustic, anti-dazzle and windward screens;
• infrastructure for the needs of facilities located along the road
express, including: power supply and lighting networks,
rainwater drainage system with pre-treatment devices,
water and sewage pumping stations, technological channels and others;
• reconstruction of conflicting equipment and networks of existing infrastructure;
underground and above-ground – demolition of buildings and structures;
• road marking and road safety equipment;
• traffic management system on the road and tunnel;
• technological channels;
• plantings of greenery;
• other preparatory, auxiliary and organizing work.
Above €5,382,000.