The construction project is the general renovation of the primary and secondary school in
Höchstädt (Danube). This building is the part of the building from the 60s and its extension from the 90s.
Both parts of the building have a basement and extend
over a total of 4 floors. (KG, ground floor, 1st floor, 2nd floor)
approx. 1330 m Dismantling of heating pipes made of steel welded
approx. 70 pcs dismantling radiators
approx. 29 pcs. Dismantling Radiators for painting
1 pc connection to on-site district heating
Safety equipment
1 manifold with 4 outlets static heating circuits
6 pcs. Mixed/controlled pump groups Ventilation units
6 pcs pumps
1 pc system for holding pressure, degassing and replenishment
approx. 184 taps
approx. 340 m threaded / seamless boiling tube
ca. 1.213 m Präzisionsstahlrohr
approx. 61 pcs. tubular radiators new
ca. 29 St. Wiedermontage Röhrenradiatoren