Partial construction and conversion of a fire station into a prehistoric centre
exhibition equipment incl. office and toilet containers, rubble containers
demolition and interception work,
Earthworks and concrete work: e.g. approx. 180 m3 Driving off the mixed soil, delivering filling sand, approx. 220 m2 coarse and fine level, approx. 68 m3 foundations, approx. 20,000 kg reinforcing steel, approx. 293 m2 Stb. base slab, approx. 78 stgm reinforced concrete (stiffening) columns, approx. 400 m2 filigree Stb. ceiling, 1 reinforced concrete staircase
Masonry and facing work: e.g. approx. 740 m2 inner shell sand-lime brick perforated brick, approx. 495 m2 Loading masonry in the "Märkischer Verband", e.g. part ornamental masonry, approx. 245 m2 thermal insulation, various steel girders and columns,
Internal plaster work: e.g. approx. 1,550 m2 lime cement plaster
exhibition equipment incl. office and toilet containers, rubble containers
demolition and interception work,
Earthworks and concrete work: e.g. approx. 180 m3 Driving off the mixed soil, delivering filling sand, approx. 220 m2 coarse and fine level, approx. 68 m3 foundations, approx. 20,000 kg reinforcing steel, approx. 293 m2 Stb. base slab, approx. 78 stgm reinforced concrete (stiffening) columns, approx. 400 m2 filigree Stb. ceiling, 1 reinforced concrete staircase
Masonry and facing work: e.g. approx. 740 m2 inner shell sand-lime brick perforated brick, approx. 495 m2 Loading masonry in the "Märkischer Verband", e.g. part ornamental masonry, approx. 245 m2 thermal insulation, various steel girders and columns,
Internal plaster work: e.g. approx. 1,550 m2 lime cement plaster