Mastic asphalt work: In the course of the general renovation and expansion of the primary and secondary school Goldbach, mastic asphalt work is to be carried out in construction phase 1.3. In BA 1.3, sections of the existing school building will be renovated.
Gussasphaltarbeiten:
The following rough quantities should be carried out:
- ca. 155 m² Feuchtigkeitsisolierung, Bitumenschweißbahn
- ca. 955 m² Ausgleichsschüttung
- approx. 900 m² multi-layer insulation board, 25 mm
- approx. 55 m² multi-layer insulation board, 27 mm
- approx. 210 m² thermal barrier layer, 60 mm (PF)
- ca. 795 m² Gussasphaltestrich (AS), 35 mm, 5,0 KN
- ca. 160 m² Gussasphaltestrich (AS), 30 mm, 3,0 KN